Configuring Inlet Supplies - Mira Extreme Thermostatic Installation & User Manual

Power shower
Hide thumbs Also See for Extreme Thermostatic:
Table of Contents

Advertisement

2. Configuring Inlet Supplies

The Mira Extreme is supplied with blanking plugs fitted to all four ports of the inlet
manifold. The pipework configuration will determine which blanking plugs and case
inserts supplied must be fitted to the case.
Use the table below for reference.
Supply Pipework
Top Entry Inlet
Bottom Entry Inlet
Wall Entry Inlet
The Mira Extreme allows for electrical cable entry from the top, bottom or back of the
case. For top and bottom entries a thinned section of the case, covering the top or the
bottom cable channel, must be removed before the cable can be fitted.
Full Case
Insert
Full Case
Insert
Half Case
Insert
Inlet Configuration Table
Inlet Manifold Ports
Fit blanking plugs to
bottom ports of the
inlet manifold.
Fit blanking plugs to
top ports of the inlet
manifold.
Fit blanking plugs to
bottom ports of the
inlet manifold.
Half Case
Insert
Case Inserts
Fit half insert in the top inlet of the
case. Fit full insert in the bottom inlet
of the case.
Fit full insert in the top inlet of the case.
Fit half insert in the bottom inlet of the
case.
Fit full insert in the top inlet of the case.
Fit full insert in the bottom inlet of the
case.
Thinned Section
of Case
Top Cable
Channel
Bottom Cable
Channel
Thinned Section
of Case
15

Advertisement

Table of Contents
loading

Table of Contents