Creating a Drive Project
10.3
Creating a drive project ONLINE
Fig. 10-55 Closing the automatic commissioning
10.Once the automatic commissioning is complete, click Close.
In the Project Navigator, all the drive unit components that have been found are displayed
with, for example, the Control Unit, Incoming supply, and Drive (see Fig. 10-56).
Fig. 10-56 Automatic configuration
11. Choose Disconnect from target system.
The drive unit, all components and the drives are now integrated in the STARTER
project.
Now you must merely configure the motors of the drives and check the topology
(see Section 10.3.3).
10-156
Select
Disconnect from target system.
Configuration with, for example, Control
Unit, incoming supply, and Drive.
SINUMERIK 802D sl Instruction Manual (BA), 05/2005 Edition
Close