Step1 - Measure Tank - FlowLine EchoPod UG06 Series Manual

Hide thumbs Also See for EchoPod UG06 Series:
Table of Contents

Advertisement

Configuration Using Display
STEP 1 - MEASURE THE TANK
Measuring the tank is one of the most important aspects in
configuring the sensor. When measuring the tank, take
into account the location of the sensor with respect to
fittings, risers, dome tops and bottoms, and identify where
the measurements are taken from the sensor. The Sensor
Height is influenced by the installation location. Sensors
mounted along the sloped portion of the tank will result in a
lower (HEIGHT) value.
installed in risers/nozzles will result in a higher (HEIGHT)
value.
The basic measurements (Height and Fill-H) for configuration are described below:
1. HEIGHT (Sensor Height) - Distance from the bottom of
the tank to the Bottom of Sensor.
a. The bottom of the tank will be the sensor's zero
level / empty level.
b. This setting determines the 4mA location.
2. FILL-H (Fill-Height) - Distance from the bottom of the
tank to the level of liquid where the tank is full is FILL-H.
a. The FILL-H is typically set to the liquid full level.
b. This setting determines the 20 mA location.
c. 20mA cannot be set within the sensor's dead
band [8" (20cm) from bottom of sensor]. Largest
FILL-H value will be as follows:
MN310140 Rev A3
(continued)
On the other hand, sensors
Largest FILL-H = HEIGHT – 8" (20cm)
Step Four
23
|

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents