Installation; Mounting Guide - FlowLine EchoPod UG06 Series Manual

Hide thumbs Also See for EchoPod UG06 Series:
Table of Contents

Advertisement

Inst
tallation
®
Echo
oPod
shou
ld always b
gask
ket for G thr
readed versi
worn
n. Always h
hand-tighten
proc
cess conditio
ons prior to s
MOU
UNTING GUID
DE
1. D
Do not moun
nt at an angl
2. L
Liquid should
d never ente
3. S
Side Wall:
a. Moun
nt at least 3"
4. D
Do not mou
nt where ob
b
beam width
a. moun
nt at least 3"
5. D
Do not moun
nt in a vacuu
6. D
Do not moun
nt in the cent
7. I
n cone bo
ottom tank,
deepest part
d
t of the tank.
Insta
allation in
existing fit
large
er than the
threads of
bush
hing such as
s the LM52-
LM5
2-3800 (4" t
hread x 2" th
LM52-2
2800
|
28
e mounted
perpendicul
ions only).
Make sure
n the transm
mitter within
system start
up.
e
er the dead b
band
from the sid
de wall
bstacles will
l intrude on
from the sid
de wall
um
ter of a dom
me top tank.
position th
he sensor
.
ttings:
If t
the existing
®
the EchoPo
od
, select a
-2800 (3" th
hread x 2" t
hread).
LM52-3800
L
ar to the liq
quid surface
that the fittin
ng and trans
the fitting.
Perform a
Do not
angle re
sensor's
Do not
3" of ta
over the
fitting is
a reducer
Do no
hread) or
obje
Do no
applic
va
Do not
center
to
(use the pr
rovided Vito
smitter threa
ads are not
an installed
leak test u
t install at an
n
relative to the
e
liquid.
l
install within
n
ank sidewall.
.
t install with
ects in the
beam.
b
ot install in
cations with
acuum.
install in the
e
r of a dome
op tank.
Step Five
e
®
n
mounting
g
damaged o
or
nder norma
al
MN310140 Rev A
A3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents