Getting Started - Teledyne Platinum Pocket Manual

Cve refrigerated sampler
Table of Contents

Advertisement

3.2 Getting Started

Apply power to the sampler (see Section 2.8).
The start-up screens appear on the LCD
display.
Note
The refrigeration system may need to sit 24 hours
before starting if the unit was tipped upside down during
shipment or installation. This will allow the oil in the
compressor to drain back.
After installing the sampler plug the power
cord into the proper receptacle. The display will
light up and programming can begin. The
program is ready to be configured.
Pgm 1: Ready: This screen displays three
menu options appear R
If you have just installed the sampler, you will
first need to program the sampler (Section 3.5).
To program the sampler:
Section 3 Programming
T
M
UN
IMED
.
ENU
3-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Optima

Table of Contents