6.
Firmly connect the CC-Link communication cable to option communication
connector CN1.
Install CC-Link communications cables apart from main-circuit wiring and other
electrical and power lines. Ensure the cable end is firmly connected (see
Refer to
Communication Cable Topology on page 30
7.
Reattach the drive front covers (C, F) and the keypad (D).
NOTICE: Do not pinch cables between the front covers and the drive. Failure to comply could cause
erroneous operation.
Figure 12
8.
Set drive parameters in
YASKAWA ELECTRIC TOBP C730600 83C YASKAWA AC Drive Option SI-C3 Installation Manual
Figure 12 Replace the Front Covers and Keypad
Table 7
for correct option performance.
5 Installation Procedure
for details.
A1000
C
F
Table
6).
D
21