Commissioning - Weber Markoprint iJET Operating Manual

Inkjet coder
Table of Contents

Advertisement

7.3 Commissioning

Installation and commissioning
1.
Check controller, power pack and all optional subassemblies
(e.g. rotary encoder, light barrier, traffic light) for stability and
safe and firm assembly.
2.
Check distance between the print head and product. The
optimal distance is 0 to 4 mm.
3.
Check that all cable connections and connecting leads on the
controller and on the subassemblies are firmly mounted.
Page 51 of 127
Art. No.: 72801001

Advertisement

Table of Contents
loading

Table of Contents