Elevator Pushrod Installation - Seagull Models BEAVER TURBIN Assembly Manual

Table of Contents

Advertisement

Beaver Turbin
2) Slide the vertical stabilizer back in-
place. Using a triangle, check to ensure
that the vertical stabilizer is aligned 90º
to the horizontal stabilizer.
Horizontal
Stabilizer.
ELEVATOR PUSHROD
INSTALLATION.
1) Install the elevator control horn using
the same method as with the aileron con-
trol horns.
2) Position the elevator control horn on
the both side of elevator.
22
Epoxy.
Vertical
Stabilizer.
90º
Instruction Manual.
Elevator control horn.
3) Thread one clevis and M2 lock nut on
to each elevator control rod. Thread the
horns on until they are flush with the
ends of the control rods.
4) Elevator pushrods assembly as pictures
below.
M2 lock nut.
8mm
M2 clevis.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents