Seagull Models BEAVER TURBIN Assembly Manual page 10

Table of Contents

Advertisement

Beaver Turbin
Instruction Manual.
INSTALLING THE ENGINE SWITCH.
M4x20mm
Thread locker glue.
Trim and cut.
Switch.
INSTALLING THE MAIN LANDING
GEAR TO FUSELAGE.
M4x20mm
1) Using the hardware provided, mount
the main landing gear to the fuselage.
2) Place the fuselage inverted on the
workbench in a suitable stand. Set the
landing gear in place and use a screw-
drive to secure the landing gear to the fu-
Epoxy.
selage using bolts M4x20mm and wash-
ers. Make sure to use the threadlock on
the bolts so they don't vibrate loose.
10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents