Seagull Models BEAVER TURBIN Assembly Manual page 16

Table of Contents

Advertisement

Beaver Turbin
1) With the muffler, needle valve, and spark/
glow plug removed from the engine, slide
the cowl in place over the engine. Temporar-
ily install the propeller and spinner in order
to find the exact location of the cowl. When
satisfied with the cowl placement, secure the
cowl to the fuselage using masking tape.
2) Install the muffler and muffler extension
onto the engine and make the cutout in the
cowl for muffler clearance. Connect the fuel
and pressure lines to the carburetor, muffler
and fuel filler valve. Secure the cowl to fuse-
lage using the M3x10mm screws.
3x10mm
16
Instruction Manual.
ELECTRIC POWER CONVERSION.
1) Locate the items necessary to install
the electric power conversion included
with your model.
2) Recommend the items necessary to in-
stall the electric power conversion parts
included with your model.
- Motor: 2000 - 2700 Watt
- Propeller: 17x 8 ~ 19x10
- ESC: 85A-110A
- Lipo Batteries: 8S - 10S
3) Attach the electric motor box to the
firewall suitable with the cross lines
drawn on the electric motor box and fire-
wall. Using M4x20mm to secure the mo-
tor box to the firewall. Please see pictures
below.
Needle valve.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents