Elevator Pushrod Installation - Seagull Models THUNDERBOLT P47G SNAFU 60 ARF Assembly Manual

Table of Contents

Advertisement

2) While holding the vertical stabilizer
firmly in place, use a pen and draw a
line on each side of the vertical stabilizer
where it meets the top of the fuselage.
Epoxy.
3) Slide the vertical stabilizer back in-
place. Using a triangle, check to ensure
that the vertical stabilizer is aligned 90º
to the horizontal stabilizer.
Horizontal
90º
Stabilizer.
Epoxy
Fill Epoxy.
Vertical
Stabilizer.
C/A glue.
Hinge.
4) When you are sure that everything is
aligned correctly, mix up a generous
amount of Flash 30 Minute Epoxy. Ap-
ply a thin layer to the mounting slot
and to bottom of the vertical stabilizer
mounting area. Apply epoxy to the bot-
tom and top edges of the filler block and
to the lower hinge also. Set the stabilizer
in place and realign. Double check all of
your measurements once more before
the epoxy cures. Hold the stabilizer in
place with T-pins or masking tape and
remove any excess epoxy using a paper
towel and rubbing alcohol. Allow the
epoxy to fully cure before proceeding.
ELEVATOR PUSHROD
INSTALLATION.
1) Locate items necessaryto install rud-
der pushrod.
50mm.
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sea207

Table of Contents