Elevator Pushrod Installation - Seagull Models TEMPEST DRAGON 15cc ARF Assembly Manual

Table of Contents

Advertisement

TEMPEST DRAGON 15cc ARF
11.
Horizontal
Stabilizer.
When you are sure that everything is
aligned correctly, mix up a generous
amount of Flash 30 Minute Epoxy. Ap-
ply a thin layer to the mounting slot
and to bottom of the vertical stabilizer
mounting area. Apply epoxy to the bot-
tom and top edges of the iller block and
to the lower hinge also. Set the stabilizer
in place and realign. Double check all of
your measurements once more before
the epoxy cures. Hold the stabilizer in
place with T-pins or masking tape and
remove any excess epoxy using a paper
towel and rubbing alcohol. Allow the
epoxy to fully cure before proceeding.
12.

ELEVATOR PUSHROD INSTALLATION

1.
Elevator control horn
28
Vertical
Stabilizer.
90º
hread one clevis and M2 lock nut on
to each elevator control rod. hread the
horns on until they are lush with the
ends of the control rods.
Elevator and rudder pushrods assembly
as pictures below.
2.
M2 clevis
Fuel tubing
Hex nut
3.
4.
5.
Instruction Manual.
Elevator Pushrod
M3x4mm

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sea 313

Table of Contents