Installation; Connect The Unit; Gauge Board Rear Connections - Varian XGS-600 Instruction Manual

Gauge controller
Table of Contents

Advertisement

Chapter 2: Installation
Each XGS-600 unit is inspected and carefully packed prior to shipment. If the unit arrives
damaged, save the packing materials and immediately notify the carrier. Because the
packing materials are designed specifically for this instrument, always use them when
transporting the unit. The shipping container is packed with the following contents:
XGS-600 gauge controller
AC line cord
Operating manual
Rubber feet, adhesive

Connect the Unit

The unit comes shipped with sensor boards configured according to customer requirements.
1. Plug the AC line cord into the receptacle on the rear panel of the unit and into the
power source. Keep power off while connecting the remaining cables.
2. Connect gauge and I/O cables depending on controller configuration according to
Figure 2-1:
Hot Filament Board
XGS-600 Gauge Controller
CAUTION
Do not block air vents. Allow approximately 3/4" clearance at
each side of the enclosure for proper air flow.
BA Gauge
Power Connector
I/O Connector
Gauge Connection
Convection Board
Figure 2-1 Gauge Board Rear Connections
NOTE
When installing and HFIG cable, make sure to connect the pig
tails from the ground cable to the ground stud. See item 7 in
Figure 1-2.
I/O Connector
Gauge Connection
CNV1, 3, 5, 7, 9, B
Gauge Connection
CNV2, 4, 6, 8, A, C
IMG Board
Gauge Connection
I/O Connector
2-1

Advertisement

Table of Contents
loading

Table of Contents