APPENDIX 3 - EXAMPLE WITH SIEMENS PLC
vacon • 61
17. Change the IO cycle to 4 ms (minimum) or greater.
11710_uk
Next step is to download the program into PLC. After this, the PLC starts communication with the
®
VACON
100 AC drive. Please note that controlling of AC drive requires a PLC programming block
which contains the controlling logic.
Local contacts: http://drives.danfoss.com/danfoss-drives/local-contacts/
9