Connecting Process And Water Supply Lines Without Purge; C Onn Ec Tin G P R O C E S S A Nd Wa T E R S Uppl Y L I N E S - Conair Thermolator TW-S User Manual

Table of Contents

Advertisement

Tools for Installation:
r Pipe wrench large
enough for a 2-inch
pipe
r Premium quality
Teflon thread
sealant
0
NOTE: Conair recommends that
you install an external ball valve
on the cooling water inlet of the
Thermolator. This valve is required
when the purge valve option is
installed.
3-6
I
I n s ta l l a t i o n
Conn ec ti ng Pro ce ss a nd Wa ter S uppl y
Li ne s Wi tho ut Purg e
The Thermolator process inlets and outlets must be connected to the plumbing that will
circulate the temperature-controlled water or fluid through the process. Cooling water
inlets and outlets are connected to the cooling water supply.
1
Remove the shipping pipe plug from the female connections on the back of the
Thermolator.
2
Install pipe to the rear of the Thermolator. Use male 1
process connections and male 1-inch NPT piping for water connections. Pipe and
pipe threads must be clean and new. Clean threads with solvent, removing all oil,
grease and dirt. Allow the threads to dry before proceeding.
3
Coat the pipe threads with thread sealant. Follow the sealant manufacturer's
directions.
4
Connect the male pipe to the appropriate female connection on the back of the
unit. Start by hand until the threads engage, then use a pipe wrench to tighten the
connection only enough to prevent leaks. Do not over-tighten!
Cooling Valve
and
From Process
connection
in this area
Cooling water out
Cooling water in
DIRECT INJECTION
/
-inch NPT piping for
1
2
To Process
connection
in this area

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thermolator tw-p

Table of Contents