Oracle Exadata Storage Server X7-2 EF Service Manual page 166

Hide thumbs Also See for Exadata Storage Server X7-2 EF:
Table of Contents

Advertisement

Install the Internal HBA Card and HBA Super Capacitor
b.
Return the server to the normal rack position.
See
c.
Reconnect the power cords to the power supplies and power on the server.
See
Server" on page
d.
Verify that the power supply AC OK LED is lit.
6.
Use Oracle ILOM to clear any server PCI card faults.
If a PCIe card fault message in Oracle ILOM is not cleared under Open Problems, you
must manually clear the fault using Oracle ILOM. For instructions for manually clearing
a PCIe card fault, see the procedure "Clear Faults for Undetected Replaced or Repaired
Hardware Components" in the Oracle ILOM User's Guide for System Monitoring and
Diagnostics Firmware Release 4.0.x in the Oracle Integrated Lights Out Manager (ILOM) 4.0
Documentation Library at http://www.oracle.com/goto/ilom/docs.
Related Information
"Remove the Internal HBA Card and HBA Super Capacitor" on page 159
166
Oracle Exadata Storage Server X7-2 EF and HC Service Manual • May 2018
"Return the Server to the Normal Rack Position" on page
"Reconnect Power and Data Cables" on page 192
193.
191.
and
"Power On the

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Exadata storage server x7-2 hc

Table of Contents