Oracle Exadata Storage Server X7-2 EF Service Manual page 117

Hide thumbs Also See for Exadata Storage Server X7-2 EF:
Table of Contents

Advertisement

c.
If you installed an Oracle Dual Port QDR InfiniBand Adapter M4 card,
reconnect the power cords and data cables to the server. Proceed to Step
5d. Otherwise, skip to Step 5e.
See
"Reconnect Power and Data Cables" on page
d.
Power on the server.
See
"Power On the Server" on page
e.
Verify that the System OK LED is lit.
6.
Use Oracle ILOM to clear any server PCIe card faults.
If a PCIe card fault message in Oracle ILOM is not cleared under Open Problems, you
must manually clear the fault using Oracle ILOM. For instructions for manually clearing
a PCIe card fault, see the procedure "Clear Faults for Undetected Replaced or Repaired
Hardware Components" in the Oracle ILOM User's Guide for System Monitoring and
Diagnostics Firmware Release 4.0.x in the Oracle Integrated Lights Out Manager (ILOM) 4.0
Documentation Library at http://www.oracle.com/goto/ilom/docs.
To determine whether additional steps are required to complete the installation
7.
of the PCIe card, refer to the server product notes for the type of PCIe card you
installed.
For a complete listing of the PCIe host bus adapter (HBA) cards supported by the server, refer
to the Oracle Server X7-2L Product Notes at http://www.oracle.com/goto/x7-2l/docs.
Related Information
"PCIe Slot Locations" on page 112
"Remove a PCIe Card" on page 113
192.
193.
Install a PCIe Card
Servicing PCIe Cards
117

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Exadata storage server x7-2 hc

Table of Contents