Mitsubishi Electric EZMotion-NC E68 Series Operation Manual page 487

Table of Contents

Advertisement

G88 (O880) Boring 3
G. 1 ;
1F [#30] GOTO1 ;
Z#2 G#6 H#7 ;
#2 = ##5
#3003 = #8 OR 1 ;
G1 Z#3 ;
G4 P#4 ;
#3003 = #8 ;
M5 ;
#3003 = #8 OR 1 ;
G0 Z − #3 − #2 ;
#3003 = #8 ;
M3 ;
N1 M99 ;
G89 (O890) Boring 4
G. 1 ;
1F [#30] GOTO1 ;
Z#2 G#6 H#7 ;
#2 = ##5
#3003 = #8 OR 1 ;
G1 Z#3 ;
G4 P#4 ;
#3003 = #8
Z − #3 ;
G0 Z − #2 ;
N1 M99%
G73 (O831) Step cycle
G. 1 ;
1F [#30] GOTO2 ;
#29 = 0
#28 = #11 ;
Z#2 G#6 H#7 ;
#2 = ##5
#3003 = #8 OR 1 ;
DO 1 ;
#29 = #29 + #11 ;
IF [ABS [#29] GE [ABS [#3] ] ] GOTO 1 ;
Appendix 4. Registering/Editing the Fixed cycle Program
4.6 Standard Fixed Cycle Subprogram (For M system)
Fixed cycle block 1 movement command
Check for fixed cycle invalidity.
Inhibit single block stop.
Dwell.
Cancel single block stop inhibition.
Rotate the spindle forward
Inhibit single block stop.
Return.
Cancel single block stop inhibition.
Rotate the spindle forward.
Fixed cycle block 1 movement command
Check for fixed cycle invalidity.
Inhibit single block stop.
Dwell.
Return.
Fixed cycle block 1 movement command
Check for fixed cycle invalidity.
Initialize the total cutting amount.
Define the cutting amount.
Single block stop command
Increment the total cutting amount counter.
Does the total cutting amount exceed the cut
amount Z?
IV-15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ezmotion-nc e60 series

Table of Contents