4.0 FACING AND FINISHING

4.1 Nailing Flange Assembly
and Installation
CAUTION: Never permanently remove these assemblies from the
fireplace—they must be secured regardless of finish material used.
1.
Remove (2) nailing flanges from the right and left side of the
fireplace.
2.
Align nailing flange with holes on outside corners of fireplace,
with the stand-off flanges on the nailing flanges facing away
from the fireplace
3.
Secure the nailing flanges to the fireplace with screws (provided)
STAND-OFF
FLANGE
Figure 4.1, Nailing Flange Installation
16 FACING AND FINISHING
BACK VIEW
NAILING FLANGE INSTALLED
NAILING FLANGE
AS SHIPPED
TOP VIEW
FRAMING STUD
2½"
(64mm)
CLEARANCE
NAILING FLANGE
Hussong Mfg. Co., Inc. • Kozy Heat Fireplaces
through the slots in nailing flanges.
4.
Bend perforation on nailing flange until parallel with fireplace
face. Do not bend toward fireplace face.
5.
Position framing stud against the small stand-off (located on
backside of nailing flange). Secure with nails or screws.
When installed, the nailing flanges provide the minimum
2½ in (64 mm) clearance from the sides of the fireplace to
framing.
FRONT VIEW
FRONT VIEW
STAND-OFF FLANGE
NAILING FLANGE
INSTALLED
NAILING FLANGE
FRAMING STUD
#CLW-50 R.1 March 2018