Facing And Finishing; Facing And Finishing Requirements - kozy heat OSSEO 45 SL Installation And Operation Manual

Table of Contents

Advertisement

3.0 FACING AND FINISHING

3.1 Facing and Finishing Requirements

3.1.1 Mantel Requirements
WARNING: All minimum clearances to combustible material MUST be
maintained.
Combustible Mantel Projections: As referenced in Figure 3.1,
the 2" (51mm) mantel can start at 2-7/8" (73mm) above the
top of the viewing opening. Mantel projections can increase 2"
(51mm) of depth for every 1" (25mm) of height starting at the 2"
(51mm) mantel.
3.1.2 Finishing Requirements
This appliance is designed to accommodate finishing material up
to 5/8" (16mm) thick.
Each square represents
of mantel projection
Top of viewing opening
Figure 3.1, Mantel Clearances
#OSO-45-SL #OSO-60-SL R.1 August 2022
1" (25mm)
Hussong Mfg. Co., Inc. • Kozy Heat Fireplaces
FACING AND FINISHING 16

Advertisement

Table of Contents
loading

This manual is also suitable for:

Osseo 60 slOsseo 45Osseo 60Oso-45-slOso-60-sl

Table of Contents