Installing The Validation Cell - ABB LS4000 Operating Instructions Manual

Diode laser analyzer, version for measuring nh3 and h2o highest precision under harshest conditions
Hide thumbs Also See for LS4000:
Table of Contents

Advertisement

Installing the validation cell

Installing the
validation cell
34
No.
Meaning
Purging flange
1
Purging flange flat gasket
2
Clamp
3
Validation cell
4
Install the validation cell as follows:
Step
Procedure
1
Place the purging flange flat gasket 2 into the groove of the purg-
ing flange 1.
2
Set the validation cell 4 on the purging flange 1 on the side of the
transmitter unit.
3
Fasten the validation cell 4 using the clamp 3.
4
For the test gas supply and discharge, connect a pipe with an
8 mm outside diameter to each 1/4 inch Swagelok
5
Install the transmitter unit.
Operating instruction LS4000 for NH
and H
O
OI/LS4000/NH3/H2O-EN
3
2
®
connection.