Completing the fine
alignment
Readiness to
measure
OI/LS4000/NH3/H2O-EN
Proceed as follows:
Step
Procedure
1
Unscrew the 4 stud screws until the ends of the screws no longer
stick out of the holes.
2
While observing the value "Absolute transmission" in the Alignment
menu, align the purging flanges by adjusting the 4 fastening nuts.
Adjust the purging flange so that the highest possible value is
displayed for "Absolute transmission".
Proceed as follows:
Step
Procedure
1
Screw in the 4 stud screws as far as they will go so that they secure
the setting.
2
Click on "Done".
3
If you do not want to perform any further tasks on the device
software, disconnect the RJ45 adapter board from the junction
box.
4
Seal the junction box
The analyzer is set to the process parameters specified by the user when
delivered. If the specifications correspond to the conditions that actually
apply to the process (temperature, pressure, optical path length, etc.), the
analyzer can be put directly into operation after fine alignment.
Operating instruction LS4000 for NH
and H
O
3