Checking the
electrical system
Approving the
analyzer for startup
52
Test object
Requirement
The transmitter unit and receiver unit are installed so that
the following requirements are met:
The housings do not come into contact with any over-
The housings are not improperly heated by the heat
Test object
Requirement
Cable condition
All cables are undamaged.
Cable types
All connections are made using the specified cable type.
Shielded cables
The shielded cables meet the following requirements:
The cables are fed through metal cable glands
The braided shield is properly connected to the cable
Supply voltage
The supply voltage is consistent with the information on
the name plate of the junction box.
Connecting
All connecting cables meet the following requirements:
cables
The cables are properly installed and secured
The cables in the junction box are connected using the
The cables in the cable glands are sealed so that no
All of the unused cable wire ends are insulated or
Cable glands
The cables in the cable glands on the transmitter unit
Potential equali-
The following devices are connected via a ground cable to
zation terminal
the local potential equalization terminal:
Transmitter unit
Receiver unit
Junction Box
If...
all the checks have been com-
pleted with positive results
at least one check gave a nega-
tive result
Operating instruction LS4000 for NH
pressure in the process gas path
generated at the contact point of the process gas path
(purging flange).
gland
correct pin assignment
dust can penetrate
grounded
and receiver unit are fitted in a fixed position and can-
not move.
then...
the analyzer may be put into use.
the analyzer may not be put into use.
the fault must be rectified.
the check must be repeated.
and H
3
2
O
OI/LS4000/NH3/H2O-EN