Installing Components; Option: Installing The Insertion Tubes; Providing An Overview - ABB LS4000 Operating Instructions Manual

Diode laser analyzer, version for measuring nh3 and h2o highest precision under harshest conditions
Hide thumbs Also See for LS4000:
Table of Contents

Advertisement

Installing components

Option: Installing the insertion tubes

Providing an overview

When must insertion
tubes be installed?
Providing an
overview
20
Topic
Option: Installing the insertion tubes .............................................................. 20
Option: Installing the isolation flange .............................................................. 22
Installing the purging flanges ............................................................................ 26
Option: Installing the validation cell ................................................................. 33
Installing the transmitter unit and receiver unit ............................................ 35
Topic
Providing an overview ......................................................................................... 20
Installing insertion tubes ..................................................................................... 21
If...
the measuring section through the process
does not allow for clear laser transmission (e.g.
due to high dust load)
the measuring path through the process en-
sures proper laser light transmission
Insertion tubes cannot be installed in conjunction with isolation
flanges.
No.
Meaning
Transmitter unit
1
Purging flange
2
Insertion tube
3
Process
4
Insertion tube
5
Purging flange
6
Receiver unit
7
Operating instruction LS4000 for NH
then...
insertion tubes must be
installed.
no insertion tubes must be
installed.
and H
O
OI/LS4000/NH3/H2O-EN
3
2
Page
Page

Advertisement

Table of Contents
loading

Table of Contents