Testing The Analyzer - ABB LS4000 Operating Instructions Manual

Diode laser analyzer, version for measuring nh3 and h2o highest precision under harshest conditions
Hide thumbs Also See for LS4000:
Table of Contents

Advertisement

Testing the analyzer

Testing the analyzer

Checking ambient
conditions
Checking the
mechanical system
Checking the
electrical system
OI/LS4000/NH3/H2O-EN
Proceed in accordance with the following checklists:
Test object
Requirement
Transmitter unit,
The ambient temperature is consistent with the infor-
receiver unit,
mation on the name plate.
junction box
Test object
Requirement
Junction box
The junction box meets the following requirements:
 The junction box is not damaged
 The junction box has been installed in a stable manner
 The junction box is closed so that no dust can pene-
Transmitter unit,
The transmitter unit and receiver unit are in the following
receiver unit
condition:
 The housings are not damaged
 The housing covers are closed and bolted
 All of the fixing screws are present.
The transmitter unit and receiver unit are installed so that
the following requirements are met:
 The housings do not come into contact with any over-
 The housings are not improperly heated by the heat
Test object
Requirement
Cable condition
All cables are undamaged.
Cable types
All connections are made using the specified cable type.
Shielded cables
The shielded cables meet the following requirements:
 The cables are fed through metal cable glands
 The braided shield is properly connected to the cable
Supply voltage
The supply voltage is consistent with the information on
the name plate of the junction box.
Connecting
All connecting cables meet the following requirements:
cables
 The cables are properly installed and secured
 The cables in the junction box are connected using the
 The cables in the cable glands are sealed so that no
 All of the unused cable wire ends are insulated or
Operating instruction LS4000 for NH
trate
pressure in the process gas path
generated at the contact point of the process gas path
(purging flange).
gland
correct pin assignment
dust can penetrate
grounded
and H
3
2
O
79