Establishing A Protective Grounding - ABB LS4000 Operating Instructions Manual

Diode laser analyzer, version for measuring nh3 and h2o highest precision under harshest conditions
Hide thumbs Also See for LS4000:
Table of Contents

Advertisement

Establishing a protective grounding

Establishing a
protective grounding
44
The protective grounding is established via the PE conductor of
the power cable.
Proceed as follows:
Step
Procedure
1
Connect the PE conductor of the power cable to the PE terminal of
the terminal strip.
Operating instruction LS4000 for NH
and H
O
OI/LS4000/NH3/H2O-EN
3
2

Advertisement

Table of Contents
loading

Table of Contents