Initial Setup and Verification
•
Items required......................................................................................................................................................... 75
•
Providing power to the device................................................................................................................................. 75
•
•
•
•
Setting the date and time........................................................................................................................................ 80
•
•
Getting in-band access........................................................................................................................................... 81
•
Verifying the correct operation................................................................................................................................. 81
•
Items required
The following items are required for initial setup and verification of the device:
•
The device, mounted and installed with the required power supply, fan assemblies, transceivers, and cables
•
A workstation computer with a terminal emulator application installed, such as HyperTerminal for Windows
•
An unused IP address with corresponding subnet mask and gateway address
•
An USB console cable with Type-C connector (Type-C USB cable not included with the device)
•
A serial console cable with an RJ-45 connector (RJ-45 console cable not included with the device)
•
An Ethernet cable
•
Access to a TFTP server or USB removable media for backing up (uploading) or downloading the device configuration (optional)
Providing power to the device
Perform the following steps to provide power to the device.
1.
Remove the power cord and the power cord retainer clip from the shipping carton container.
2.
Install the power cord retainer clip to the power supply inlet on the device.
3.
Connect the power cord to the power supply inlet on the device. Ensure that the power cords have a minimum service loop of 6
inches available and are routed properly to avoid stress.
4.
Insert the power cord plug to power sources on separate circuits if there is more than one power cord for a single device in order
to protect against power failure.
5.
If applicable, power on the power sources by flipping the switches to the on position. The SYST LED displays amber until power-
on self-test (POST) is complete and then starts blinking green until the device is completely up. The device usually requires several
minutes to boot and complete POST.
NOTE
Power is supplied to the device as soon as the first power supply is connected and turned on. If the power indicator
does not turn on when the power cord is plugged in, you may have a problem with the power outlet, power cord, or
internal power supply.
Ruckus ICX 7150 Switch Hardware Installation Guide
Part Number: 53-1004928-05
75