Preparing for the Installation

Quick installation checklist

TABLE 9 Facility requirements (continued)
Type
Requirements
Quick installation checklist
The following checklist provides a high-level overview of the basic installation process from the planning stage to the point where the device
comes online and is ready to be deployed. Completing all the tasks in the suggested order ensures successful installation. Brocade
recommends that you print this checklist and take it to the installation site.

Pre-installation tasks

Review all installation requirements ahead of time as part of your site preparation. Careful planning and site preparation ensures seamless
installation, especially when installing multiple devices.
TABLE 10 Installation prerequisites
Task
Unpack the device.
Gather necessary components and required
tools.
Review the safety precautions.
Plan the installation.
Review and verify installation requirements.
Gather network configuration parameters.

Installation and initial configuration

The initial setup includes mounting the device on a flat surface or in a rack and completing the configuration tasks necessary to bring the
device online and verify the operation.
24
Additional weight of switch not to exceed the rack's weight limits
Temperature: Because the temperature within a rack assembly may be higher than the ambient room temperature,
check that the rack-environment temperature is within the specified operating temperature range.
Airflow: Be sure that the airflow direction for all equipment in a rack is the same or consistent.
Mechanical loading: Do not place any equipment on top of a rack-mounted unit.
Rack secured to ensure stability in case of unexpected movement
Circuit overloading: Be sure that the supply circuit to the rack assembly is not overloaded.
Task details or additional information
Take an inventory of the hardware components included in your shipment. Refer to
Shipping carton contents
Review the time and items required information at the beginning of each chapter to ensure
you have gathered all necessary components required for the following installation tasks:
Mounting the Device
Installing Transceivers and Cables
Refer to
Safety precautions
Cautions and Danger Notices
Decide whether you want to install the unit on a flat surface or in a rack. For rack
installation, obtain the appropriate rack mount kit. Refer to
Verify that the following requirements are met. Refer to
General requirements
Power requirements
Environmental requirements
Clearance for standalone or rack installation
IP address:
Subnet mask:
Default gateway:
Time zone:
on page 26.
on page 27.
on page 83.
on page 21. For translation of these messages, refer to
on page 115.
Facility requirements
Mounting options
on page 27.
on page 23.
Ruckus ICX 7150 Switch Hardware Installation Guide