NEC Express5800 series User Manual page 157

Hide thumbs Also See for Express5800 series:
Table of Contents

Advertisement

Server ~ Pull-out from the Rack ~
The server needs to be pulled out from the rack for installing/removing any components other
than the hard disk drives and power supply units.
Observe the following instructions to use the server safely. Failure to follow these
instructions may result in death or serious personal injury.
Do not install the server on a rack with the covers removed.
Do not pinch your finger between mechanical components.
Do not pull the server out from the rack if the rack is unstable.
Do not have more than one device pulled out from the rack at a time.
1.
See the section "Preparing for Installation and Removal" described earlier to prepare.
Unlock the front bezel with the security key and remove the front bezel.
2.
Loosen the two set screws on the front panel.
3.
CAUTION
Security lock
Upgrading Your NEC Storage 147

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storage ns420

Table of Contents