5.5

Requirements for the fresh water connection

Each appliance carries the DVGW test symbol and does not require an extra safety
valve in the water feed.
Fresh water connection must be made according to EN 1717 or according to
local regulations.
The machine is equipped with a water supply air gap (group A, model A in
accordance with DIN EN 1717).
The minimum flow pressure of the clean water supply upstream of the solenoid
valve must be 0.6 bar and if water-softening (AktivClean) equipment is
incorporated into the machine: 1 bar.
The maximum pressure must not exceed 5 bar.
If the flow pressure is below the minimum, increase the flow pressure with a
booster pump; if the maximum pressure is exceeded, limit it with a pressure
reducer.
A water stop is integrated into the fresh water inlet of the machine. This, together
with the leak water switch in the floor pan of the base, ensures that the fresh
water supply will be cut off in the event of any leak
Suitable protective measures must be taken to ensure that no iron particles can
enter the appliance via the mains water supply. Similarly, precautions must be
taken to prevent the entry of other metal particles, for example copper turnings.
Corresponding instructions are contained in the installation drawing. Therefore
suitable measures must be taken.
A dirt trap must be fitted into the fresh water supply to protect the solenoid valve.
5.6

Requirements for the waste water connection

A waste water pump is integrated in the waste water line. A siphon must be
provided by the client on site (further information about this is in the technical
sheet).
The drain hose must be connected to the waste water pipe in the building.
A grease trap may be needed, depending on the machine application.
5.7

Emergency-off

Set the local main switch to „OFF" or switch off the local main fuse.
Update: 2008-03-10
W e reserve the right to change execution and construction!
S. „FV 40 G"
11/42
9544094

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fv 60.2

Table of Contents