Establishing connection and verifying the IEEE C37.118/1344 communication
9.5.1
Transformer protection RET670 2.2 IEC
Commissioning manual

Verifying the IEEE C37.118/1344 TCP communication

After setting both PMU configuration and the TCP client configuration (As
explained in sections
Setting the PMU station communication (PMU
Setting the PMU station communication (PMU configuration)
TCP/UDP client
communication) and making sure that the Ethernet
communication is set up, click Connect on the PMU Connection Tester tool.
IEC140000138 V1 EN-US
Figure 10:
Verifying the TCP communication using PMU Connection Tester
Now it should be possible to see the streaming synchrophasor data. In the
Graph tab, observe the Frequency, data Reporting Rate, Phasor names, and
Phase angles of the reported synchrophasors. Observe the real-time frame
details of the Data Frame in the bottom of the window.