ABB RET670 Commissioning Manual page 141

Relion 670 series, transformer protection
Hide thumbs Also See for RET670:
Table of Contents

Advertisement

1MRK 504 165-UEN A
Transformer protection RET670 2.2 IEC
Commissioning manual
Testing functionality by secondary injection
Test point
Reach
Set value
6
X
RLdFw x tan (ArgLd)
R
RLdFw
7
X
RLdFw x tan (ArgLd)
R
0
8
X
–0.2143 x RFPPZx/2
R
0.8 x RFPPZx/2
9
X
–0.4 x RLdFw x tan(ArgDir=20°)
R
0.4 x RLdFw
10
X
0.5 x X1
R
–0.23 x X1
11
X
0.8 x X1
R
–0.37 x X1
12
X
0.5 x X1
R
0.5 x R1
13
X
0
R
0.5 x RFPPZx
Table
32
is used in conjunction with figure 35.
11
X1Zx+XNZx
10
40% of RLdFw
80% of RLdFw
alt. 80% of
RFPEZx (Load
encroachment)
IEC05000369 V4 EN-US
Figure 36:
Distance protection characteristic with test points for phase-to-
earth measurements
Table
33
is used in conjunction with figure 36.
set
set
set
set
set
set
X
2
1
80%
3
50%
4
12
5
120°
a
6
R (Ohm/loop)
7
13
9
20°
8
RFPEZx
IEC05000369-4-en.vsdx
Section 11
Comments
Exact: 0.8 x RFPPZx/2
(ArgDir=20°)
Exact –0.5 x R1
x
set
tan(ArgNegRes=30°)
Exact –0.5 x R1
x
set
tan(ArgNegRes=30°)
135