Section 10
Testing IED operation
10.7
94
If the IEC/UCA 61850-9-2LE communication is interrupted during
current injection, the report tool in PCM600 will display the current
that was injected before the interruption.
IEC10000032 V1 EN-US
Figure 20:
PCM600 report tool display after communication interruption

Testing the protection functionality

Each protection function must be tested individually by secondary injection.
Verify operating levels (trip) and timers.
Verify alarm and blocking signals.
Use the disturbance handling tool in PCM600 to evaluate that the protection
function has received the correct data and responded correctly (signaling and
timing).
Use the event viewer tool in PCM600 to check that only expected events have
occurred.
1MRK 504 165-UEN A
IEC10000032-1-en.vsd
GUID-125B6F28-D3E5-4535-9CD6-6C056B79F496 v2
Transformer protection RET670 2.2 IEC
Commissioning manual