Completing The Test; Estimation Of Transformer Insulation Life Lolsptr; Verifying The Signals And Settings - ABB RET670 Commissioning Manual

Relion 670 series, transformer protection
Hide thumbs Also See for RET670:
Table of Contents

Advertisement

1MRK 504 165-UEN A
11.13.6.1
11.13.7
11.13.7.1
Transformer protection RET670 2.2 IEC
Commissioning manual
Testing functionality by secondary injection
the function and check that the counter result corresponds to the number of
operations.

Completing the test

Continue to test another function or end the test by changing the Test mode setting
to Off. Restore connections and settings to their original values, if they were
changed for testing purposes.

Estimation of transformer insulation life LOLSPTR

Prepare the IED for verification of settings outlined in Section
to verify
settings".

Verifying the signals and settings

Time measurement and the injection of current and voltage can be done using
common test equipment.
Verifying HPTMPMAX and TOTCALC outputs
1.
Connect the test set for injection of three-phase currents to the appropriate
current terminals of the IED.
2.
Activate the TOTVALID input and set some temperature value in TOTEMP
input.
3.
Supply the IED with three-phase currents slightly more than the rated value.
4.
Make sure that the hot spot temperature (HPTMPMAX) is more than the set
value of TOTEMP.
5.
Activate the AMBVALID input and set some temperature value in
AMBTEMP input.
6.
Make sure that the top oil temperature calculated (TOTCALC) is more than
the set value of AMBTEMP.
Verifying WARNINGx and ALARMx outputs
1.
Connect the test set for injection of three-phase currents to the appropriate
current terminals of the IED.
2.
Make sure that the settings in the IED are appropriate, especially the warning
temperature levels (WrnHPTmpLevX) and alarm time settings
(tDelayToAlarmX).
3.
Supply three-phase currents nearly zero to the IED and take note of hot spot
temperature (HPTMPMAX).
4.
Make sure that the WARNINGx and ALARMx signals remains low.
5.
Supply three-phase currents slightly more than the rated value to the IED and
take note of hot spot temperature (HPTMPMAX).
Observe the maximum permitted overloading of the current circuits in the
IED.
Section 11
GUID-325F040B-BADC-4281-B965-9B7D6BFA3E15 v1
GUID-C08B2360-2134-43DD-9F39-54CD9FA45B5B v1
"Preparing the IED
GUID-1B9A0E70-A40C-4C83-A314-26B4B33C2F97 v1
GUID-95D0A8EC-8901-4269-9FD3-7D7F386E6BB3 v1
GUID-85CA2ABF-13A9-4A4B-8E3F-AEF71D091E32 v1
269

Advertisement

Table of Contents
loading

Table of Contents