234
If the UB1/2OK inputs for the fuse failure are used, they must be activated, during
tests below. Also verify that deactivation prevents operation and gives an alarm.
1.
Connect the signals above to binary inputs and binary outputs.
2.
Connect the voltage inputs to the analog inputs used for each bus or line
depending of the type of busbar arrangement and verify that correct output
signals are generated.
Testing the voltage selection for double breaker
This test should verify that correct voltage is selected for the measurement in the
SESRSYN function used for a diameter in a One-and-a-half breaker arrangement.
Apply a single-phase voltage of 100% GblBaseSelLine to the U-Line and a single-
phase voltage of 100% GblBaseSelBus to the U-Bus. Verify that correct output
signals are generated.
1.
Connect the analog signals to the voltage inputs, in pair of two for U1 and
U2. (Inputs U3PBB1, U3PBB2, U3PLN1, U3PLN2)
2.
Activate the binary signals according to the used alternative. Verify the
measuring voltage on the synchronizing check function SESRSYN. Normally
it can be good to verify synchronizing check with the same voltages and
phase angles on both voltages. The voltages should be verified to be available
when selected and not available when another input is activated so connect
only one voltage transformer reference at each time.
3.
Record the voltage selection tests in a matrix table showing read values and
AUTOSYOK/MANSYOK signals to document the test performed.
Testing the voltage selection for 1 1/2 CB arrangements
At test of the SESRSYN function for a 1½ CB diameter the following alternative
voltage inputs can be used for the three SESRSYN (SESRSYN 1, SESRSYN 2,
SESRSYN 3) functions. These three SESRSYN functions can either be in one, two
or three different IEDs. Table
SESRSYN 2 and SESRSYN 3 all are in the same IED. If SESRSYN 3 is in another
IED, WA1 will be considered as WA2 and LINE2 as LINE1. The voltage is
selected by activation of different inputs in the voltage selection logic as shown in
table
37
and figure 54.
Table 37:
Voltage selection logic
SESRSYN
CBConfig
setting
SESRSYN 1
1 ½ bus
(Operates on
CB
WA1_QA1)
Table continues on next page
37
describes the scenario when SESRSYN 1,
Section to
Activated
Activated
be
B1QCLD
B2QCLD
synchroniz
input on
input on
ed
IED from
IED from
WA1 –
LINE1
WA1 –
TIE_QA1
LINE2
WA1 –
TIE_QA1
WA2_QA
WA2
1
1MRK 504 165-UEN A
GUID-12E7DA63-FE04-4C83-9BA6-34818C510DB8 v4
Activated
Activated
Indication
LN1QCLD
LN2QCLD
from
input on
input on
SESRSYN
IED from
IED from
on IED
LINE1_Q
B9
LINE2_Q
B9
Transformer protection RET670 2.2 IEC
Commissioning manual
M2377-691 v6
B1SEL,
LN1SEL
B1SEL,
LN2SEL
B1SEL,
B2SEL

Advertisement

Table of Contents
loading

Table of Contents