Installation - gefran SBI-DN Instruction Manual

Interface board devicenet
Table of Contents

Advertisement

2.2 INSTALLATION

The SBI interface card is delivered with a kit including 6 standoffs (no.4 L=26.5
mm + no.2 L=10mm), 4 screws, washers the WARRANTY label and a 40-pole flat
cable with connectors.
Tools required (depending on models):
WARNING: Before using the product, read the TPD32-EV safety instruction section
(on TPD32-EV manual). Never open the device or covers while the AC Input power
supply is switched on. Wait for at least one minute before working on the terminals
or inside the device.
Figure 1
mounting form A
2
3
1
1.5 Nm
1.
The front covers of the devices must be removed to mount the option cards. The
devices can be opened without the use of force. Only use the tools specified.
Removing the lower cover:
To remove the lower cover of devices, use a cross screwdriver. Remove the
screws (1) (2), lift cover (3), and open out to the front. See figure 1..
Removing the upper cover:
- Frame A: there are 2 seal pins on the top. To remove the cover, align the two
slots with the pins and lift the cover as shown in Figure 2:
- Frame B-C-D: loosen the 4 screws (4), align the slots of the cover with the
head of the screws and remove the cover. See figure 1.
Disconnect the keypad cable from the control card.
Note: for Frame D, remove only the keypad cover.
10
——————
GEFRAN
7x2 mm slotted-head screwdriver
Torx ® screwdriver: T10, T20, T25.
Cross-head screwdriver #1, 2, 3.
Socket wrench 6mm
® Registered trademark of Camcar LLC of Acument
Global Technologies.
mounting form B, C, D
4
4
3
1
1.5 Nm
Interface Board DeviceNet
4
4
4
4
2
——————
4
4

Advertisement

Table of Contents
loading

Table of Contents