Mounting and Commissioning

This chapter is primarily intended for experienced commissioning engineers. The commissioning engineer
must be familiar with the commissioning of protection and control systems, with the management of power
systems and with the relevant safety rules and guidelines. Under certain circumstances adaptations of the
hardware to the particular power system data may be necessary. The primary tests require the protected object
(line, transformer etc.) to carry load.
3.1
Mounting and Connections
3.2
Checking Connections
3.3
Commissioning
3.4
Final Preparation of the Device