Rail Kit And Mounting Components; Rail Kit Assembly Overview - Mellanox Technologies Grid Director 4700 Installation Manual

Table of Contents

Advertisement

Mellanox Grid Director 4700 Installation Manual
6.2.1

Rail Kit and Mounting Components

The 4700 package includes:
Rail kit
Mounting ears (or 19" brackets) that are factory installed at the front of the chassis
The supplied rail kit is adjustable to allow for mounting the chassis in racks of varying depths.
The rail bracket kit includes the following items:
Left bracket (left rail)
Right bracket (right rail)
2 inserts (with elongated holes) – same for both left and right rails
8-32 screws 5/8" (qty: 2 x 8)
8-32 screws 3/8" (qty: 2 x 3) – to be used in case of chassis transportation in a rack.
8-32 nuts (qty: 2 x 11)
M4 flat washers (qty: 2 x 11)
Spring washers (qty: 2 x 8)
Tooth washers (qty: 2 x 3)
6.2.2

Rail Kit Assembly Overview

This section shows a diagram of an assembled rail kit and provides the procedures for
assembling the rail kit.
Clip nuts are not provided.
55

Advertisement

Table of Contents
loading

Table of Contents