System Installation Procedures - Canon CXDI-50G Service Manual

Cxdi-1 system
Hide thumbs Also See for CXDI-50G:
Table of Contents

Advertisement

4.2 System Installation Procedures

No.
Step
1
Unpacking and checking the
product's constituent parts
2
Connect the Imaging Unit
and the Power Box
3
Connect the Power Box and
the Control PC
4
Connect the Power Box and
the X-ray generators
5
Check date and time
6
Check the software
program's version
7
Identifying the Imaging Unit
(input the sensor serial
numbers)
8
Enter control PC serial
number.
(9)
Adjusting the timing with X-
ray generator
10
Calibration
11
Setting the Fixed ROI Areas
12
Set exposure parameter table
13
Set annotation
14
Connect the network and set
the output destination
15
Startup settings
16
Exposure testing
17
Check the linearity of the
transferred image density.
18
Operation unit Gamma
correction
19
Body parts settings
20
Check and set the system
settings.
21
Total adjustments and delete
the unnecessary data.
22
Cleaning
2. Installation Manual
Conditions and Checkpoints
-There must be no missing parts, damage,
dents, etc.
-There must no color changes in the shock
sensor.
-Handle the instrument carefully, as it may
be damaged if something is hit against it,
dropped or receives the strong jolt.
-The cable must be routed in such a way that
no unreasonable loads are brought to bear
upon them.
-The cable must be routed in such a way that
no unreasonable loads are brought to bear
upon them.
-The manufacturer of the X-ray generators
must be asked to handle the connections
with the generators.
- Date and time must be changed according
to the area where the instrument is installed.
-The compatibility of the sensor unit and the
Control PC must be checked on the
compatibility list, and the software program
must be installed or upgrade as required.
-No required usually.
-No error must be displayed.
If necessary, set the ROI area.
-Set it in consultation with the technician.
-Set it in consultation with the technician.
-The data must be sent to the printer and
storage and the image quality must be
checked.
-The engineer in charge must be consulted
prior to perform these settings.
-The engineer in charge must be consulted
prior to perform these settings.
-Conform according to the check sheet.
-Delete the unnecessary data.
- 8 -
Reference Section
"(1) Checking and
Setting the Date and
Time" in section 5.6.
"(2) Checking the
Firmware Version" in
section 5.6.
"(6) Identifying the
Sensor Units" in section
5.6.
"(7) Entering Control
PC Serial Number" in
section 5.6.
Operation Manual
"(8) Table Setup
Setting" in section 5.6.
"(9) Performing the
Annotation Setting" in
section 5.6.
"(10) Network
Connections" in section
5.6.
"(5) Set Up Startup
Menu" in section 5.6.
Section 5.7 Image
Quality.
"(11) Linearity Check
Image Density" in
section 5.6.
"(12) Operation Unit
Gamma Correction" in
section 5.6.
Operation Manual
Each section in section
5.6 Settings.
Section 5.8 Post-
installation check.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents