GE G60 Instruction Manual page 504

Generator protection system
Hide thumbs Also See for G60:
Table of Contents

Advertisement

CONTROL ELEMENTS
CHAPTER 5: SETTINGS
to
— These settings specify FlexLogic operands (per breaker pole) that supervise
BRK 1 FLSHOVR SPV A
BRK 1 FLSHOVR SPV C
the operation of the element per phase. Supervision can be provided by operation of other protection elements, breaker
failure, and close and trip commands. A six-cycle time delay applies after the selected FlexLogic operand resets.
— This setting specifies the time delay to operate after a pickup condition is detected.
BRK FLSHOVR PKP DELAY
5
5-328
G60 GENERATOR PROTECTION SYSTEM – INSTRUCTION MANUAL