INSTALLATION

UPS Installation

NOTE Do not make unauthorized changes to the UPS; otherwise, damage may occur to
your equipment and void your warranty.
To install the UPS:
1.
2.
USB Port
X-Slot
Communication
Bay
Ground
Bonding Screw
REPO Port
Power Cord (0.9m/3 ft)
with L6-30 Plug
3.
4.
16
EATON Powerware
If you are installing power management software, connect your
computer to the USB port, UPS communication port, or optional
X-Slot
card (see Table 10 on page 35). For the communication port,
®
use only the serial cable supplied in the E65 accessory kit.
If your rack has conductors for grounding or bonding of ungrounded
metal parts, connect the ground cable (not included) to the ground
bonding screw.
Communication
Load Segment
Port
Circuit Breakers
L6-30 Receptacle
Figure 14. UPS Rear View
If an emergency power-off (disconnect) switch is required by local
codes, see the following section, "Remote Emergency Power-off
Installation" to install the REPO switch before powering on the
UPS.
Continue to "Power Connections and Startup" on page 19.
®
5125 (9910-E65) UPS Installation Guide for IBM
Battery Circuit Breaker
IEC 320-C19 Receptacles
®
S
Applications
164201698 Rev 1
IEC 320-C13
Receptacles
Battery Connector

Advertisement

Table of Contents
loading

Table of Contents