3.
If additional EBMs are to be installed, plug the EBM cable of the
second cabinet into the battery connector on the first EBM. Repeat
for each additional EBM. Up to four EBMs may be connected to the
UPS.
4.
Continue to the following section, "UPS Installation."
NOTE After UPS installation, ensure maximum battery runtime by configuring the UPS for
the correct number of EBMs (see "Configuration Mode" on page 30).
Battery Circuit
Breakers
®
EATON Powerware
5125 (9910-E65) UPS Installation Guide for IBM
Battery Circuit Breaker
Figure 13. Typical EBM Installation
®
S
Applications
164201698 Rev 1
INSTALLATION
UPS Battery
Connector
EBM Cable
EBM Battery
Connectors
15