Eaton Powerware 5125 Installation Manual page 16

For ibm applications
Hide thumbs Also See for Powerware 5125:
Table of Contents

Advertisement

INSTALLATION
The UPS chassis (32 kg/71 lb) and EBM (69.9 kg/154 lb) a
are required to lift the cabinets into the rack.
10. Slide the UPS and any optional EBMs into the rack.
11. Secure the front of the UPS to the rack using two pan-head screws
UPS
Optional
EBM
10
EATON Powerware
in the top and bottom positions of each mounting bracket (see
Figure 7). Repeat for each cabinet.
Figure 7. Securing the Mounting Brackets
®
5125 (9910-E65) UPS Installation Guide for IBM
C A U T I O N
heavy. A minimum of two people
re
Pan-Head
Screws
®
S
Applications
164201698 Rev 1

Advertisement

Table of Contents
loading

Table of Contents