Eaton Powerware 5125 Installation Manual page 11

For ibm applications
Hide thumbs Also See for Powerware 5125:
Table of Contents

Advertisement

To install the rail kit(s):
NOTE If installing EBM(s), install the EBM rails below the UPS rails.
1.
Loosen the assembly wing nuts on both rail assemblies and adjust
the rail size for the depth of your rack (see Figure 1).
Front
Rail Assembly
2.
Select the proper holes in the rail for positioning the UPS and any
optional cabinets in the rack.
Place the first rail at the bottom, using positions 1 and 6 for the
front pan-head screws. If you are installing additional rails, place the
next rail 4 holes above the last installed screw (see Figure 2).
®
EATON Powerware
5125 (9910-E65) UPS Installation Guide for IBM
Assembly Wing Nuts
Figure 1. Adjusting the Rail Depth
®
S
Applications
INSTALLATION
Rear
5
164201698 Rev 1