Eaton Powerware 5125 Installation Manual page 18

For ibm applications
Hide thumbs Also See for Powerware 5125:
Table of Contents

Advertisement

INSTALLATION
13. For each optional EBM, loosen the wing nut on the rear hold-down
14. Tighten the pan-head screws that secure both rails to the front of
15. Continue to the following section, "Installing the Internal Batteries."
12
EATON Powerware
bracket and slide the EBM rear hold-down bracket into the slots on
the EBM rear panel.
Verify that the rear hold-down bracket is fully seated and then
tighten the wing nut.
Figure 9. Securing the Back of the EBM
the rack (see Step 3 on page 6).
®
5125 (9910-E65) UPS Installation Guide for IBM
Wing Nut on Rear
Hold-Down Bracket
(attached to rail)
Rear Hold-Down Bracket
(for EBM)
®
S
Applications
164201698 Rev 1

Advertisement

Table of Contents
loading

Table of Contents