3 .6 Maintenance

Regular maintenance may be a legal requirement. In
Italy it is required by Presidential Decree 412 of the 26th
August 1993. It is also essential for the safety, efficiency
and durability of the boiler. Proper maintenance keeps
consumption and emissions down, and ensures that
the boiler continues to operate reliably over time.
Perform the following operations before beginning any
maintenance:
− Switch the electricity supply OFF at the system's
main switch and at the control panel.
− Close the fuel shut-off cocks.

3 . 7 PREMIX gas burner

2
5
2
8 1
1
3
4
6
3
4
9
On completion of maintenance, the original settings
must be restored and combustion fumes analysed
to verify correct functioning.
1
Gas solenoid valve
2
Air inlet
3
Flame detection sensor
4
Combustion head
5
Fan control unit
6
Fan
7
Ignition electrode
8
Ignition transformer
9
Gas supply fitting
51
THECNICAL ASSISTANCE SERVICE