Riello KV/200 - 20 ISC User Manual
Riello KV/200 - 20 ISC User Manual

Riello KV/200 - 20 ISC User Manual

Residence colonna condens solar
Hide thumbs Also See for KV/200 - 20 ISC:

Advertisement

RESIDENCE COLONNA CONDENS SOLAR KV/200 - 20 ISC
RESIDENCE COLONNA CONDENS SOLAR KV/200 - 30 ISC
EN USER MANUAL

Advertisement

Table of Contents
loading

Summary of Contents for Riello KV/200 - 20 ISC

  • Page 1 RESIDENCE COLONNA CONDENS SOLAR KV/200 - 20 ISC RESIDENCE COLONNA CONDENS SOLAR KV/200 - 30 ISC EN USER MANUAL...
  • Page 2: Table Of Contents

    Please accept our renewed thanks for your purchase. Riello S.p.A. CONTENTS GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 General safety information .
  • Page 3: General

    GENERAL GENERAL 1 . 1 General safety information This instruction manual and that for the installer Periodically check that operating and Technical Assistance Service are integral parts of pressure in the water circuit is the boiler. They must be kept safe and must ALWAYS over 1 bar.
  • Page 4: Control Panel

    GENERAL 1 .3 Control panel tHE MAIN CONtROL pANEL 40 60 80 Boiler pressure gauge Displays the pressure in the central heating circuit. Storage cylinder temperature selector (NOt uSED) The temperature of the domestic hot water is preset to 44°C in the factory. The thermostatic mixer valve has to be adjusted to change this value (see page 38).
  • Page 5 GENERAL SOLAR CONtROLLER Function selector Enter button Parameter selector Escape button Function selector Storage cylinder top temperature sensor No function selected / Stand-by. (The display − The display reads out the temperature curren- shows that the system is switched on but in tly measured by storage cylinder top tempera- stand-by mode) ture sensor F3.
  • Page 6: Start-Up

    START-UP 2 START-UP Have r’s Technical Assistance Service start-up your boiler for the first time. Once this has been done, the boiler can be left to function automatically. Under certain circumstances, such as after long periods of disuse, the user may need to re-start it without involving the r's Technical Assistance Service .
  • Page 7 START-UP − Set the room thermostat to the required tempe- rature (~ 20°C) or, if the system has a timer or ti- mer-thermostat, make sure that this is switched “On” and adjusted to the required temperature (~ 20°C). Turn the function selector (3) to " "...
  • Page 8 START-UP Once you have set the required domestic hot water temperature, you can lock the adjustment knob of the mixer valve to prevent further tampering. To do so, unscrew the fixing screw from the top of the knob and pull off the knob. Fit the knob again so that M I N the keyway in the knob's body engages with the key in M A X...
  • Page 9: Shutdown

    START-UP RESEt FuNCtION To reset the boiler, turn the function selector to “ ”, then return it to its previous position and check that the red LED goes out. Provided correct functioning condi- tions have been restored, the boiler restarts automati- cally.
  • Page 10: Warning Leds And Errors

    START-UP 2 .2 Warning leds and errors tHE MAIN CONtROL pANEL Green LED (3) Off = boiler in stand-by, burner out On = burning lit, boiler functioning normally. Red LED (5) Safety shutdown: an error code flashes on the display. Burner lockout: the red LED lights and an error code flashes on the display.
  • Page 11: Cleaning

    START-UP 2 .3 Cleaning Use a cloth damped in soapy water to clean the boi- ler’s external panelling. To remove stubborn marks, use a cloth damped in a 50% mix of water and denatured Do not use abrasive products, petrol or triethylene. alcohol or a suitable cleaning product.
  • Page 12 RIELLO S.p.A. 37045 Legnago (VR) Tel. 0442630111 - Fax 044222378 - www.riello.it As part of the company’s ongoing commitment to perfecting its range of products, the appearance, dimensions, technical data, equipment and accessories may be subject to variation.

This manual is also suitable for:

Kv/200 - 30 isc

Table of Contents