Bfd For Is-Is Configuration Example - HP 6125XLG Layer 3 - Ip Routing Configuration Manual

Blade switch
Hide thumbs Also See for 6125XLG:
Table of Contents

Advertisement

BFD for IS-IS configuration example

Network requirements
As shown in
at the network layer.
After the link over which Switch A and Switch B communicate through the Layer-2 switch fails, BFD
can quickly detect the failure and notify IS-IS of the failure. Switch A and Switch B then communicate
through Switch C.
Figure 46 Network diagram
Device
Switch A
Switch C
Configuration procedure
1.
Configure IP addresses for interfaces. (Details not shown.)
2.
Configure basic IS-IS:
# Configure Switch A.
<SwitchA> system-view
[SwitchA] isis
[SwitchA-isis-1] network-entity 10.0000.0000.0001.00
[SwitchA-isis-1] quit
[SwitchA] interface vlan-interface 10
[SwitchA-Vlan-interface10] isis enable
[SwitchA-Vlan-interface10] quit
[SwitchA] interface vlan-interface 11
[SwitchA-Vlan-interface11] isis enable
[SwitchA-Vlan-interface11] quit
# Configure Switch B.
<SwitchB> system-view
[SwitchB] isis
[SwitchB-isis-1] network-entity 10.0000.0000.0002.00
[SwitchB-isis-1] quit
Figure
46, run IS-IS on Switch A, Switch B and Switch C so that can reach each other
Interface
IP address
Vlan-int10
10.1.0.102/24
Vlan-int11
11.1.1.1/24
Vlan-int11
11.1.1.2/24
Vlan-int13
13.1.1.2/24
Device
Interface
Switch B
Vlan-int10
Vlan-int13
175
IP address
10.1.0.100/24
13.1.1.1/24

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5920 series5900 series

Table of Contents