HP 6125XLG Layer 3 - Ip Routing Configuration Manual page 426

Blade switch
Hide thumbs Also See for 6125XLG:
Table of Contents

Advertisement

[SwitchA-pbr6-aaa-5] apply next-hop 1::2
[SwitchA-pbr6-aaa-5] quit
# Configure IPv6 interface PBR by applying policy aaa to VLAN-interface 11.
[SwitchA] interface vlan-interface 11
[SwitchA-Vlan-interface11] ipv6 address 10::2 64
[SwitchA-Vlan-interface11] undo ipv6 nd ra halt
[SwitchA-Vlan-interface11] ripng 1 enable
[SwitchA-Vlan-interface11] ipv6 policy-based-route aaa
2.
Configure Switch B:
# Create VLAN 10.
<SwitchB> system-view
[SwitchB] vlan 10
[SwitchB-vlan10] quit
# Configure RIPng.
[SwitchB] ripng 1
[SwitchB-ripng-1] quit
[SwitchB] interface vlan-interface 10
[SwitchB-Vlan-interface10] ipv6 address 1::2 64
[SwitchB-Vlan-interface10] ripng 1 enable
[SwitchB-Vlan-interface10] quit
3.
Configure Switch C:
# Create VLAN 20.
<SwitchC> system-view
[SwitchC] vlan 20
[SwitchC-vlan20] quit
# Configure RIPng.
[SwitchC] ripng 1
[SwitchC-ripng-1] quit
[SwitchC] interface vlan-interface 20
[SwitchC-Vlan-interface20] ipv6 address 2::2 64
[SwitchC-Vlan-interface20] ripng 1 enable
[SwitchC-Vlan-interface20] quit
Verifying the configuration
# Enable IPv6 and configure the IPv6 address 10::3 for Host A.
C:\>ipv6 install
Installing...
Succeeded.
C:\>ipv6 adu 4/10::3
# On Host A, Telnet to Switch B that is directly connected to Switch A. The operation succeeds.
# On Host A, Telnet to Switch C that is directly connected to Switch A. The operation fails.
# Ping Switch C from Host A. The operation succeeds.
Telnet uses TCP, and ping uses ICMP. The preceding results show that all TCP packets arriving on
VLAN-interface 1 1 of Switch A are forwarded to next hop 1::2, and other packets are forwarded through
VLAN-interface 20. The IPv6 interface PBR configuration is effective.
414

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5920 series5900 series

Table of Contents