Allen-Bradley PowerFlex 755T Installation Instructions Manual page 82

Powerflex 750-series products with totalforce control
Hide thumbs Also See for PowerFlex 755T:
Table of Contents

Advertisement

Chapter 4
Mechanical and Electrical Installation
2
1
M10
17 mm
38 N•m (336 lb•in)
2
M10 x 20mm
T45
42.4 N•m (375 lb•in)
82
2. Remove the three M12 x 13 mm hex nuts that secure the flex bus cables
to the AC input fuse terminals and remove the flex bus cables. See
Figure
45.
Figure 45 - Chassis and AC Bus Connections
3
3
Leave these M10 screws in
place while preparing the
service cart.
3. Remove the two M10 x 20 mm screws that secure the LCL filter module
chassis to the control bus frame.
Leave the two M10 x 20 mm screws that secure the LCL filter module
chassis to the floor mounting bracket while preparing the PowerFlex
750-Series service cart.
4. Secure the service cart to the floor mounting bracket in the enclosure.
See PowerFlex 750-Series Service Cart Instructions, publication
IN105, for information on using the service cart.
5. Remove the two remaining M10 screws to release the LCL filter
module.
6. Use the service cart, 20-750-MCART1, to remove the LCL filter
module from the enclosure.
Rockwell Automation Publication 750-IN100B-EN-P - July 2017
Step 14
5
750-

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerflex 755tlPowerflex 755trPowerflex 755tm

Table of Contents